The team at work in the shop
Viewed: 182 times.
|
Matt prepares a wheel spacer to be placed on the base
Viewed: 147 times.
|
Al Gritzmacher works on the pneumatics test bed
Viewed: 156 times.
|
Kyle grinds a piece of 80-20 for the base
Viewed: 139 times.
|
The base is starting to take shape!
Viewed: 148 times.
|
Zack and Matt work on the prototype base
Viewed: 134 times.
|
The frame of Billy shortly before he is scrapped for parts; a sad day for the Warlocks
Viewed: 143 times.
|
Another view of Billy's frame before disassembly
Viewed: 139 times.
|
Mark, Mr Ellis and Don place a gearbox on the base
Viewed: 155 times.
|
Don, Mr Ellis and Mark work on the base
Viewed: 152 times.
|
Kyle, Matt and Duncan work on the 80-20 base
Viewed: 148 times.
|
Mark works on the prototype ball collector
Viewed: 145 times.
|
Nate and Mark work on a motor
Viewed: 151 times.
|
Nate works on the wooden base for an award to be presented to other teams
Viewed: 131 times.
|
Zack and Matt working on the prototype base
Viewed: 125 times.
|
Don works his magic
Viewed: 125 times.
|
Matt and Ryan place a wheel on the base
Viewed: 133 times.
|
Chandler works on chains for the drive train
Viewed: 127 times.
|
Tom and Jeremy place a piece of 80-20 vertically on the frame
Viewed: 121 times.
|
The team works on the base
Viewed: 114 times.
|